Keshuo Motor Products

Keshuo Motor Micro Motors Product Grid

Keshuo Motor Factory - Complete Motor Lineup, Custom OEM micro motors from design to production

+
  • 28-32(长丝杆)-0-1125-956.jpg
  • 28-32(长丝杆)-3-1125-956.jpg
  • 28-32(长丝杆)-4-1125-956.jpg
  • 28-32(长丝杆)-2-1125-956.jpg
  • 28-32(长丝杆)-1-1125-956.jpg

28mm 1.8° Long Lead Screw Stepper Motor 2-Phase NEMA 11 KS-28HYB

Motor Model:                    KS-28HYB

NEMA Motor Size:          28.0mm NEMA 11 Stepper Motor

Screw Length Range:       105mm T5 Screw Shaft (12 ~ 300 mm Options) 

Stock Status: The KS-28HYB motor is currently out of stock. To proceed, please provide detailed specifications and dimensions of your required motor. This will help us offer an accurate production timeline and cost estimate.

Production Lead Time: Typically 10-15 business days.
Special Deal:  Take advantage of exclusive discounts for bulk orders! Contact us for more details.

Affiliated Classification:

Linear Actuator

Lead Screw Stepper Motor

28mm

Top Picks

NEMA Stepper Motor

NEMA 11(28mm)

Product Accessories:


Product Description

📝 28mm NEMA 11 Stepper Motor Lead Screw Linear Actuator Datasheet📊


The 28mm 1.8° Long Lead Screw Stepper Motor (Model: KS-28HYB) is a high-performance 2-phase NEMA 11 motor designed for precision and reliability. Featuring a compact 28mm NEMA 11 frame, it offers exceptional accuracy with a 1.8° step angle. This motor is ideal for applications requiring smooth linear motion, thanks to its long lead screw design. 

Perfect for small-scale automation, CNC machines, and DIY projects, the KS-28HYB delivers consistent power and efficiency. Choose from a variety of lead screw sizes to meet your specific needs. Trust this motor for dependable performance in your next project!

 Model

KS-28HYB28

KS-28HYB29

KS-28HYB30

KS-28HYB32

KS-28HYB40

KS-28HYB50

KS-28HYB51

KS-28HYB52

Motor Diameter

28.0mm

28.0mm

28.0mm

28.0mm

28.0mm

28.0mm

28.0mm

28.0mm

Motor Thickness

28.0mm

29.0mm

30.0mm

32.0mm

40.0mm

50.0mm

51.0mm

52.0mm

Shaft Length

21.0mm

20.0mm

/

27.0mm

12.0mm

12.0mm

14.0mm

18.0mm

Step Angle

1.8°/step

1.8°/step

1.8°/step

1.8°/step

1.8°/step

1.8°/step

1.8°/step

1.8°/step

Rated Voltage

6.9V DC

6.6V DC

8.2V DC

5.5V DC

8.2V DC

6.0V DC

6.2V DC

9.9V DC

Rated Current

1 A

0.5 A

1 A

1 A

1 A

1 A

0.67 A

1 A

Holding Torgue

0.9kg.cm

0.65kg.cm

0.8kg.cm

1.2kg.cm

1.5kg.cm

2.1kg.cm

1.3kg.cm

2.1kg.cm

Phase Count

2-Phase

2-Phase

2-Phase

2-Phase

2-Phase

2-Phase

2-Phase

2-Phase

Resistance

6.9Ω

13.2Ω

8.2Ω

5.5Ω

8.2Ω

9.9Ω

9.2Ω

9.9Ω

Inductance

3mH

8.1mH

4.5mH

3.5mH

6.5mH

9.2mH

5.7mH

9.6mH

Noise

≤50dB

≤50dB

≤50dB

≤50dB

≤50dB

≤50dB

≤50dB

≤50dB

Certification

CE, RoHS

CE, RoHS

CE, RoHS

CE, RoHS

CE, RoHS

CE, RoHS

CE, RoHS

CE, RoHS

*For optimal alignment with your project goals, kindly provide the details mentioned earlier. If you have special requirements or need tailored solutions, our technical support team is ready to assist. They offer professional guidance and customized solutions designed to meet your unique needs.  
 

📐📄 28mm Screw Stepper Motor NEMA 11 Linear Actuator Outline Drawing


φ28mm long screw stepper motor nema 11 linear actuator outline drawing

 

💡 Applications of Linear Screw Actuator


3D Printers, CNC Machines, Medical Devices, Robot, Optics and Laser Systems, DIY Projects, Textile Machinery, Packaging Equipment

 

 

 

Keywords:

nema 11 lead screw stepper motor, 6v stepper motor, 8v stepper motor, 9v stepper motor, 28mm stepper motor, lead screw stepper motor, linear stepper motor, hybrid stepper motor, stepper motor supplier, low noise lead screw stepper motor, 1.8° stepper motor, 2-phase stepper motor, lead screws, lead screw linear motion, screw actuator 
 

 

 

 

 

 

 

 

Development Samples & Engineering & Manufacturing:

For production quotes or consultations on customization and integration services, please contact one of our Sales Engineers. 

 

Payment Methods:

We accept the following payment methods:   PayPal or T/T

 

🔊FAQ – Frequently Asked Questions

Q: What information should I provide if I want a custom motor?

A: Please provide the basic specifications of the motor, including dimensions, size, voltage, speed, and torque. It’s also helpful to send prototype drawings of your application if possible.

 

Q: What types of motor do you offer?

A: We offer a wide range of motor, Diameter 6mm–86mm DC Micro Motor and Gear Motor, Electric Motor, Auto DC Motor, Stepper Motor, Brushed DC Motor, Brushless DC Motor, Spur Gear Motor, Vibration Motor, etc.  
 

Q: What are the main applications of your micro DC motor?

A: Our mini DC motor are widely used in various industries and applications, such as:

✔️Home Appliances - For smart home devices and household automation.  
✔️Office Equipment - Powering office tools like printers, scanners, and copiers.  
✔️Health Care Applications - Used in medical devices like infusion pumps and diagnostic equipment.  
✔️Sanitation Industry - In automated cleaning devices and equipment.  
✔️High-End Toys - For precision movement in advanced toys and gadgets.  
✔️Banking Systems - In ATMs and other banking automation equipment.  
✔️Electronic and Electrical Tools - Powering tools like drills, screwdrivers, and other compact machinery.  
✔️Automation Industry - For use in robotic systems, automated assembly lines, and industrial machines.  
✔️Banking Equipment - In card readers, cash dispensers, and similar devices.  
✔️Payment Systems - For precise control in point-of-sale devices and vending machines.  
✔️Vending Machines - Powering mechanisms for product dispensing and coin operations.  
✔️Electric Door Locks - In smart locking systems for security applications.

 

 

Ceitification:

In terms of product quality management, the company has passed and implemented management system certifications such as automotive industry quality management system certification (✅IATF 16949:2016), medical device quality management system certification (✅ISO13485:2016), ISO9001 quality management system certification (✅ISO9001:2015), etc.

Enquire Now

If you are interested in our products, please leave your e-mail, we will contact you as soon as possible, thank you!

Submit Message